G&M EMAIL Sitemap Contact
PRODUCT LIST
New Products
Lighting
Lamp-House Series
LED Lamp-House
CFL Lamp-House
Wall Lamp Series
LED Wall Lamp
Fluorescent Wall Lamp
Desk Lamp Series
HalogenDeskLamp
LED Desk Lamp
Table Desk Lamp
Energy- saving Desk Lamp
Mini Desk Lamp
Out Door lamp Series
Solar Stone Lamp
Garden Lamp
Garden socket
Ceiling Lanp Series
Metal Spot Lamp
Children Lamp
Glass Lamp
Floor Lamp Series
LED Flash Lighting Series
Household Appliance
Electric Kettle
SandWich Maker
Grill
太阳能
SHOPPING CATE
HOMEPAGE ABOUT US R & D QUALITY PRODUCTS CONTACT  
HOME -> QUALITY

Quality Control System

Quality is a company's life. Being one of the most significant departments of a company, setting "the qualification rate of 100%" as the quality goal, our quality control department performs testing, inspection and management work.
The Quality Control (QC) department manages three teams, IQC, PQC and FQC, with the member of 6, 6, and 4 respectively. The total 16 members (1 department head and1 director) have secondary educational level or above, and over 2 years' working experience in the same industry as well. They perform inspection and testing rigorously according to GB7000 1-2002/IEC60598-1: 1999 《Luminaries General Requirements and Tests》, and UL1598-January 31,2000 《Luminaries Security Standard 》to meet customers' requirements.
Incoming Quality Control (IQC):
1. When parts are delivered to the factory, the warehouse keeper will check the delivery note, confirming names of articles, specification, quantity, and whether the packaging is damaged, and then leaves the goods in the inspection area.
2. The IQC department performs sampling inspection accordingto the Production Plan, Inspection Guidance Book, and technical flow chart. The reference sample is always used in inspection If available. After the inspection, a GRN (Goods Receipt Note) of the raw material will be filled in and a report will be sent to the Supply Department and the Warehouse. If the inspection cannot be performed in factory, the Supply Department is required to get the inspection report as well as the qualified agreement from its sub-contractor.
3. Inspectors put pass labels on the parts if it passes theinspection and complete the receipt procedure. If the parts don't pass, inspectors will put the fail labels on andfeedback timely to the Supply Department, which together withthe warehouse are responsible for isolating the parts and manage the returned parts procedure according to the Control Procedure of Nonconforming Products.
4. The urgently needed raw materials having no time to get inspection can be released by the warehouse keeper after the production department completing the Emergent Release Application and getting it reviewed by the QC department. Inspectors leave samples of the same batch according to GB/T2828, 1-2003/ISO2859-1: 1999 Batch Sampling Plan under Inspection Procedure of Count Sampling, continue the inspection and mark the Emergent Release on the Stores Requisition.
With the rising demand to ourselves, the IQC work has already extended to the sub-contractors' factories by taking aperiodic inspection on all the raw materials under control so as to enhance efficiency and reduce defected products at an early stage.
© 2006 Shaoxing Aonuo Electric Appliance Manufacture Co., Ltd. ALL RIGHT RESERVED. Tel:0575-2065033
浙ICP备05002653 Power By:CHINADSNT.COM